Building Renovation RAID Log

This is a practical guide to building a raid log for a building renovation project — a consolidated log of Risks, Assumptions, Issues and Dependencies, adapted to the realities of renovating or refurbishing an existing building.

What a RAID Log is

A raid log is a consolidated log of Risks, Assumptions, Issues and Dependencies. For the full concept and how it works in general, see RAID Log. On a building renovation project it plays the same role, tuned to this kind of work.

Why it matters for a Building Renovation project

Building Renovation projects live or die on renovating or refurbishing an existing building. A well-built raid log gives the team a shared, explicit reference for exactly that — reducing ambiguity, aligning stakeholders, and making problems visible early enough to act. Skipping it, or doing it generically, is how building renovation projects drift into avoidable delay and cost.

What to include

  • Risks
  • Assumptions
  • Issues
  • Dependencies
  • Owners and status

Building Renovation-specific considerations

Tailor the raid log to the risks that most often derail building renovation projects:

  • Unknown existing conditions
  • Occupied-site working
  • Scope changes on discovery

Example

On a real building renovation project, the raid log would be shaped by renovating or refurbishing an existing building. In particular, it should explicitly account for the project’s biggest risks — unknown existing conditions, occupied-site working, scope changes on discovery — rather than treating them as afterthoughts.