Project Cost Estimate Calculator
Three-point cost estimate plus contingency — a defensible budget number in seconds.
Expected = (O + 4M + P) ÷ 6 · Budget = Expected × (1 + contingency%)
Three-point cost estimate plus contingency — a defensible budget number in seconds.